Horsham Air Guard Stn. Environ. Restoration
The Pennsylvania Air National Guard has placed copies of documents that comprise its Environmental Restoration Program's (ERP) Administrative Record on deposit with the Horsham Township Library.  These documents relate to the Horsham Air Guard Station's committments to meeting the standards prescribed in all applicable Comprehensive Environmental Response, Compensation, and Liability Act regulations.

These documents exist in PDF format only.  They may be read on-line, down-loaded and printed from this library's website without restriction.

Horsham Air Guard Station Environmental Restoration Program Administrative Record

Jump directly to: Guidance Documents   Environmental Assessments  Correspondence  Reports and Plans

Document Number Link to PDF Document Name Document Date Document Type
Guidance Documents
79448 79448 PADEP Closure Requirements for Underground Storage Tank Systems 4/1/1998 Guidance
Environmental Assessments
Cover letter & Draft Environmental Assessment for public review 6/21/2012-7/20/2012 Cover letter

Draft Environmental Assessment Proposed Construction and Demolition Projects at the 111th Fighter Wing
Cover Letter re Environmental Assessment Public Review
Draft Environmental Assessment Proposed Construction and Demolition Projects at the 111th Fighter Wing
6/20/2012 Environmental Assessments
Correspondence
79351 79351 Meeting Minutes from the Spill and Immediate Response Initiatives Meeting with Regulators Held May 8 and 9, 1991 5/9/1991 Correspondence
79391 79391 Transmittal of Tank Closure Report and Site Assessment work Plan to PADER from PA ANG 9/28/1992 Correspondence
71000 71000 Letter from PADEP to PA ANG Regarding Contamination at Former Underground Storage Tank Site (Tanks 001 and 002) 2/28/1994 Correspondence
79402 79402 Letter from PADER to PAANG Providing Compliance Schedule for Site Assessment Activities 2/28/1994 Correspondence
79412 79412 Letter from PA ANG to PADER Providing Update of Cleanup Efforts 10/3/1994 Correspondence
63849 63849 Letter from ANG to PADEP Requesting Comments on Draft Final Site Assessment Report 1/22/1995 Correspondence
63844 63844 Letter from PADER to PAANG Documenting Receipt of Closure Report 4/28/1995 Correspondence
63851 63851 Transmittal of Final Meeting Minutes for Kickoff Meeting held December 11-12, 1995 to Meeting Attendees from PEER (Minutes Attached) 1/17/1996 Correspondence
63861 63861 Transmittal of Draft Final Site Assessment Report to USEPA from PEER 1/29/1996 Correspondence
63862 63862 Comments from PADER to ANG on Draft Final Site Assessment Report 1/30/1996 Correspondence
63860 63860 Letter from ANG to PA DEP Stating Motor Pool Area is not a CERCLA Project 6/14/1996 Correspondence
63872 63872 Letter from EPA to ANG Notifying of Change in Remedial Project Manager 1/3/1997 Correspondence
63870 63870 Transmittal of Final Meeting Minutes for Regulatory Meeting Held March 10, 1997 to Attendees from Peer (minutes attached) 4/17/1997 Correspondence
63873 63873 Comments from PADEP to ANG on Final Regulatory Meeting Minutes for Meeting Held March 10, 1997 6/24/1997 Correspondence
79423 79423 Letter from PADEP to PAANG Concurring with Recommendation of Draft Site Characterization Report 6/29/1998 Correspondence
63893 63893 Transmittal of Draft Groundwater Monitoring Work Plan to Technical Investigation Section from Peer 11/23/1998 Correspondence
63905 63905 Letter from PA ANG to Horsham Township Providing Notification of Intent to Remediate 12/7/1998 Correspondence
63906 63906 Letter from PADEP to PA ANG Confirming Receipt of the Notice of Intent to Remediate 12/22/1998 Correspondence
63907 63907 Letter from ANG to PADEP Providing Notification of Intent to Mobilize to the Site to Sample Groundwater and Remove Free Product 1/11/1999 Correspondence
63892 63892 Transmittal of final Groundwater Monitoring Work Plan to ANG and PADEP from Peer 1/27/1999 Correspondence
63890 63890 Transmittal of Final First Round Monitoring Report to ANG and PADEP 5/25/1999 Correspondence
63889 63889 Transmittal of Draft Second Round Monitoring Report to ANG and PADEP from Peer 8/16/1999 Correspondence
63888 63888 Transmittal of Final Second round Monitoring Report to ANG and PADEP from Peer 9/20/1999 Correspondence
63887 63887 Transmittal of Draft Third Round Monitoring Report to ANG and PADEP from Peer 11/17/1999 Correspondence
63886 63886 Transmittal of Final Third Round Monitoring Report to ANG and PADEP from Peer 12/17/1999 Correspondence
63885 63885 Transmittal of Draft Fourth Round (Final) Semiannual Groundwater Monitoring Report to ANG and PADEP from Peer 4/3/2000 Correspondence
40203 40203 Comments from PADER to ANG/CEVR on Fourth Round Semiannual Groundwater Monitoring Report 6/12/2000 Correspondence
63883 63883 Transmittal of Final Fourth Round Semiannual Groundwater Monitoring Report to ANG from PADEP from Peer 7/17/2000 Correspondence
63882 63882 Transmittal of Draft Fifth Round Semiannual Groundwater Monitoring Report to ANG and PADEP from Peer 9/22/2000 Correspondence
63880 63880 Transmittal of Final Fifth Round Semiannual Groundwater Monitoring Report to ANG and PADEP from Peer 12/13/2000 Correspondence
82113 82113 Letter from ANG/CEVR to PADEP Providing Notification of Intent to Mobilize for Free Product Removal and Groundwater Monitoring for Site 1 1/21/2001 Correspondence
63879 63879
Transmittal of Draft Sixth Round Semiannual Groundwater Monitoring Report to ANG and PADEP from Peer 5/2/2001 Correspondence
79430 79430
Transmittal of Final Work Plan to ANG and PADEP from PEER 12/18/2001 Correspondence
79433 79433
Letter from PADEP to ANG Regarding Review of Draft Work Plan and Changes to Regulatory Requirements 1/11/2002 Correspondence
79343 79343 Comments from PADEP to ANG on Final Site Characterization Report and Groundwater Monitoring Report 2/11/2002 Correspondence
87504 87504 Comment Letter from ANG/CEVR to PA DEP Regarding Response to Comments for Motor Pool Area, Underground Storage Tanks Final Work Plan 3/5/2002 Correspondence
79438 79438 Transmittal of Draft 1st Quarter-removal Action 98th Round) Monitoring Report to PADEP from PEER 7/10/2002 Correspondence
79439 79439 Comments from PADEP to ANG on Draft Completion Report for Interim Removal Action Operations 8/1/2002 Correspondence
3860 3860 Comments on Draft Completion Report 8/6/2002 Correspondence
79443 79443 Transmittal of PEER Response to ANG Comments on Draft Completion Report to PADEP from PEER (Responses Attached) 11/13/2002 Correspondence
87503 87503 Transmittal from PEER to ANG/CEVR, PA ANG and PA DEP Regarding Final Tenth Round Groundwater Monitoring Report 9/23/2003 Correspondence
79447 79447 Letter from PADEP to ANG Stating No Further Action is Necessary at Site 1 11/20/2003 Correspondence
63878 63878 Transmittal of Final Sixth Round Semiannual Groundwater Monitoring report to ANG/PADEP from Peer 7/12/2004 Correspondence
28053 28053 Regulatory Meeting, Final Meeting Minutes 1/27/2005 Correspondence
Reports and Plan Documents
40003 40003 Final Phase 1 Records Search 11/1/1984 Report/Plan
41771 41771 Remedial Investigation Report for Willow Grove Air Reserve Facility 3/28/1988 Report/Plan
79343 79343 Plans and Specifications for Underground Storage Tank Removal 6/1/1991 Report/Plan
87667 87667 Final Underground Storage Tank Closure Assessment Work Plan 2/1/1992 Report/Plan
68517 68517 Management Action Plan 9/1/1995 Report/Plan
41777 41777 Final Site Assessment Report, Volume 1, Motor Pool Area, Building No. 352 3/1/1996 Report/Plan
41778 41778 Final Site Assessment Report, Volume 2 Appendices, Motor Pool Area, Building No. 352 3/1/1996 Report/Plan
41786 41786 Final Site Characterization Work Plan Addendum, Motor Pool Area 10/1/1997 Report/Plan
40008 40008 Final Site Characterization Report: Motor Pool Area 9/1/1998 Report/Plan
40006 40006 Final Workplan for Semiannual Groundwater Monitoring 1/1/1999 Report/Plan
87666 87666 Final Semiannual Groundwater Monitoring Report - First Round of Sampling (February 1999) 5/1/1999 Report/Plan
41790 41790 Final Semiannual Groundwater Monitoring Report , Second Round of Sampling (June 1999), Motor Pool Area 9/1/1999 Report/Plan
82105 82105 Letter from ANG/CEVR to PADEP Providing Notification of Intent to Mobilize for Free Product Removal and Groundwater Sampling for Site 1 9/21/1999 Report/Plan
40005 40005 Final Semiannual Groundwater Monitoring Report Third Round of Sampling (September 1999) 12/1/1999 Report/Plan
40007 40007 Final Semiannual Groundwater Monitoring Report Fourth Round of Sampling (March 2000) 7/1/2000 Report/Plan
63727 63727 Final Groundwater Monitoring Report Fifth Round of Sampling (August 2000) 12/1/2000 Report/Plan
87664 87664 Final Groundwater Monitoring Report - Sixth Round of Sampling (January/April 2001) 7/1/2001 Report/Plan
87663 87663 Final Work Plan for Interim Removal Action Operations 12/1/2001 Report/Plan
6615 6615 Final Letter Report Seventh Round/Baseline Groundwater Monitoring Report 1/1/2002 Report/Plan
6639 6639 Work Plan for Interim Remedial Action Operations 8/1/2002 Report/Plan
6638 6638 Final Groundwater Monitoring Report First Quarter Removal Action, 8th Round 10/1/2002 Report/Plan
87662 87662 Final Groundwater Monitoring Report - Second Quarter Removal Action (Ninth Round) Motor Pool Area 2/1/2003 Report/Plan
83888 83888 Final Groundwater Monitoring Report Tenth Round Motor Pool Area 9/1/2003 Report/Plan
87665 87665 Final Completion Report for Interim Removal Action Operations at the Motor Pool Area 10/1/2003 Report/Plan
18845 18845 Final Project Close Out Well Abandonment Report, ST001 12/1/2004 Report/Plan
NGB/A7OR LUC_2014_SEPT.pdf Institutional Control Inspection Report for Site 1 - Privet Road
Cover letter & report
9/4/2014 Report/Plan
       
       
       
       
      Horsham Township Library | 435 Babylon Road Horsham, PA 19044-1224  |  Phone: (215) 443-2609  |  Fax: (215) 443-2697
      Contact Us  |  Site Map  |  Terms of use   |  Powered by MunicipalCMS
      E-notify RSS Feeds Twitter Facebook 
      0